„Elektroprivreda Srbije” has 22 thermal units,
49 hydro units, 1 pump storage hydropower plant with 2 units, and 1 pumping plant
with 2 pumps.
Since 1990, the maximum annual generation of power plants
managed by EPS was realized in 2013 – 37,433 GWh of electricity.
9 TPPs and CHPs
Installed capacity – 4,840 MW
Mean annual generation – 24,360 GWh, which makes
approximately 69% of electricity generation in EPS
Nikola Tesla A and B TPPs
Installed capacity – 3,066 MW
Mean annual generation – 17,031 GWh, which makes approximately 49% of
electricity generation in EPS
Kolubara TPP and Morava TPP
Installed capacity - 364 MW
Mean annual generation – 1,241 GWh, which makes approximately 3.6% of
electricity generation in EPS
Kostolac A and B TPPs
Installed capacity – 1,007 MW
Mean annual generation – 5.875 GWh, which makes approximately 17% of
electricity generation in EPS
Since 1990, the maximum annual generation of thermal power plants of PE EPS was
realized in 2013 – 26,537 GWh of electricity.
Panonske CHPs
Capacity - 403 MW
Mean annual generation – 212.5 GWh, which makes approximately 0.6% of
electricity generation in EPS
Hydropower plants
Capacity – 3.015 MW
Mean annual generation – 10,537 GWh, which makes approximately 30% of
electricity generation in EPS
Djerdap HPPs
Capacity - 1.396 MW
Mean annual generation amounts to 6,783 GWh, which makes
approximately 19% of electricity generation in EPS
Vlasinske hydro power plants and Pirot hydro power plant mean generation
amounts to 397.3 GWh, which makes approximately 1.1% of electricity generation
in EPS
Drinsko-Limske HPPs
Capacity of 9 HPPs amounts to 1,390 MW
Mean annual generation amounts to 3,322 GWh, which makes approximately 10% of
electricity generation in EPS
Small
HPPs
Capacity
20.8 MW
Mean
annual generation of small hydropower plants in EPS amounts to approximately 35
GWh of electricity.