“TPP Nikola Tesla" Branch is the top electricity producer in the SEE. It has 14 units with total installed capacity of 3,288 MW, which represents one third of total installed capacities of Electric Power Industry of Serbia. TENT annual generation is higher than 50 percent of electricity generation in Serbia.  The largest units, B1 and B2 with available capacity of 580 МW each, are in “TPP Nikola Tesla B".

Installed capacity of 921 МW enables 5,989 GWh annual generation of TPPs “Kostolac A and B", which makes 17 percent share of EPS electricity generation.

Total capacity of eight PE EPS TPPs, with 25 operating units, is 5,171 МW. They are lignite-fired.

 

ТPPs “Nikola Tesla A and B"

Capacity – 2,787 MW

Annual generation – 17,889 GWh, which makes 50 percent share of EPS electricity generation.

 

ТPPs “Kostolac A and B"

Capacity - 921 MW

Annual generation – 5,989 GWh, which makes 17 percent share of EPS electricity generation.

 

Generation in TPPs “Kolubara", “Morava" and “Panonske CHPs“ was 1,183 GWh, which makes 3 percent share of EPS electricity generation.

 

Maximum annual generation of power plants operated by EPS, as from 1990, was achieved in 2013 and amounted to 37,433 GWh of electricity.